Details: dismantling of flexible pavement (bituminous courses) by mechanical means and disposal of dismantled material up to a lead of 1 kilometre, as per direction of engineer-in-charge. disposal of building / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by engineer-in-charge, beyond 50m initial lead, for all leads including all lifts involved. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work up to plinth level :1:4:8 (1 cement : 4 coarse sand (zone-iii) : 8 graded stone aggregate 40 mm nominal size) steel reinforcement for r.c.c. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.thermo-mechanically treated bars of grade fe-500d or more. centering and shuttering including strutting, propping etc. and removal of form for : wall
Sector: Industry Development