Details: plain reinforced cement concrete (m-25) 1:1.5:3 in wearing coat complete as per drawing and technical specification as per sor si no 284a. mild steel or iron work such as in reinforced concrete as in reinforced brick work (when not including in over all rates) required for proper completion of work as per sl no 504 lettering and painting for new work (two or more coats applied @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/10 sqm. (as per dsr no.- 13.48a.1). transpotation and fixing at site including cartage for proper completion of work.
Sector: PWD