Details: removal of rank vegetation/weeds and undesirable vegetation from shoulders, embankment slopes upto row (both sides) complete in all respects including breaking of clods, rough dressing and disposal of waste material and vegetation at a place outside row as per direction of engineer- in-charge and as per maintenance standards clause 3.3 (frequency will be once in a quarter). a) shoulders including side slopes of embankment upto toe line on both sides of the carriageway. (frequency of cleaning will be four times in a year; however limited to only areas prone to growth of rank/ undesirable vegetation and weeds). providing spot reconditioning, reconstruction and regravelling to repair specific erosion or other damages for restoring the eroded area to originally constructed cross section on cuts and fills slopes/ shoulders conforming to technical specificationsclause no. 3002. fill material should be brought from borrow areas located outside row conforming to technical specification no. 305
Sector: Road development