Details: earth work in rough excavation,banking excavated earth in layers not exceeding 20 cm in depth clods watering,rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions,all leads as per (most/ar/yeida) for all kind of soil. extra for compaction of earth work in embankment under optimum moisture conditions to give at least 97% of the maximum dry density (proctor density).dar-18/16.2/p-240 preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm. depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth lead upto 50 metres.dar-2018/16.1/p-262 supplying and stacking at site ….90 mm to 45 mm size ston
Sector: Industry Development