Details: dismantling cement concrete or brick or granolithic floors, including base concrete and including stacking of dismentled materials as directed by the engineer -in-charge with in a distance of 60m (200 ft.). earth work in excavation by mechanical means ( hydraulic excavator ) / manual means in foundation trenches or drains ( not exceeding 1.50 m in width or 10 sqm on plan ),excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m including dressing of sides and ramming of bottoms, lift up to 1.50 m includig the getting out of all kind soil providing & laying plain cement concrete 1:4:8 with cement, coarse sand & 40 mm gauge brick ballast including all materail, labour & t&p etc. brick work with common burnt clay ( non modular ) brick of class m-150 in foundation and plinth in cement mortar 1 : 6 ( 1 cement : 6 coarse sand ). providing and laying cement concrete in retaining walls, return walls, walls (any
Sector: Irrigation