Details: clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of up to a distance of 50 m outside the periphery of the area cleared. (uppwd/sor-2020/259(i)) extra for compaction of earth work in embankment under optimum moisture conditions to give at least 95% of the maximum dry density (proctor density). (dar/16.2/based on uppwd/sor-2020) preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead upto 50 metres. (dar/16.1/based on uppwd/sor-2020)) supplying and stacking at site. 90 mm to 45 mm size stone aggregate (dar/16.3.1/based on uppwd/sor-2020)) 63 mm to 45 mm size stone aggregate (dar/16.3.2/based on uppwd/sor-2020)
Sector: Industry Development