Details: e/w filling in or in embankment in ordinary soil excavation to be in the form of a regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5m lift and 30 m lead. the earth in form of cutting (b) to be used as spoil banks within 50m distance as directed by the engineer-in-charge including royalty 9.00 . including cartage of earth up to 8 km lead. providing and laying cement concrete in 1:5:10 (1 cement :5 fine sand :10 stone ballast 40 mm guages) and curing complete, including cost of form work in foundation and floors. m-150 brick work in 1:4 with cement and coarse sand including supply of all material, labor t & p etc. required for proper completion of work. providing, laying and spreading 22.4-53 mm stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 whose steel/vi