Details: civil work clearing and grubbing road land including uprooting wide vegetation, grasss, bushesh, shrub, sapling and trees of girth up to 300 mm, removal of stumps of such trees cut earlier and disposal of unservisable materials and stacking of serviceable matterial to be used or auctioned upto a lead of 1000 m includiong removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201 construction of embankment with approved material obtained from borrow pits with a lift up to 1.5 m, spreading, grading to required and compacting to meet requirement of tables 300.1 and 300.2 with a lead up to 1000 m as per technical specification clause 301.5 construction of granular sub-base by providing will graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at omc, and compacting with smooth wheel roller to achieve the desired density, complete as per technical specific
Sector: RDPR