Details: laying and jointing pvc pipe. heading water diversion and site clearance excavation in foundation in ordinary soil including lift upto 1.5 m & lead upto 30 m and including filing waterion and rammimg of excavated earth into thr trenches or into the space between the building and sides of foundation trenches or into the plinth & removal and disposal of surplus earth as directed by the engineer incharge upto the a distance of 30 m from thr foundation trenches by hydrolic excavator/ manual means (sor pwd 251,251a) providing and laying of cement concrete in foundation including supply pf all materials ,labours and t&petc required for proper completion of the work 1:3:6 (1 cement : 3 coarse sand: 6 graded stone aggregate 40 mm nominal size) .(sor -280) filling in foundation trenches as per drawing & technical specification clause 305.3.9 providing and laying in position specified grade of reinforcement cement concrete including the cost of cemterion shuttering finishing and excluding r
Sector: RDPR