Details: tar/ cc road cutting & its stacking old materials including supply of lab, t&p all complete cutting of pavment & its stacking old materials including supply of lab, t&p all complete excavation of foundation in ordinary soils (loam/clay or sand) including lift upto 1.50m&lead up to 30mtr. and including filling, watering& ramming of excavated earth in to trenches or in to space between the building & the side of foundastion of trenches of in to the plinth and removal of surplus etc all complete.a-lift up to 1.50 mtr concret with 4 mm guage b/b white lime& fine surkhi in foundation and uneer floors in the proportion of 100:16:32 including supply of all mat., lab., t&p etc all complete. making necessary arrangment of barricading with sal ballies fixed horizantaly& verticaly with provision of red flag red larten and night watch man including supply of all mat., and lab., t&p etc all complete as directed by site i/c first class brick work with 1:4 cement 15 mm thick plaster with 1:4 ceme
Sector: RDPR