Details: collection of 22.4-53 mm stone ballast of approved quarry duly stacked at site of work including cost of material, cartage, stacking charges, loading & unloading, royalty etc. complete. but excluding gst consolidation of 22.4-53mm gauge stone ballast 10cm thick (loose) coat spreading, ballast making medhies to retain water and carriage of metal upto 30m carriage of water upto 200m maintenance of barriers and all labour t&p including road roller charges etc. required for proper completion of work . but excluding gst providing and applying tack coat with bitumen vg-10 at the rate of 0.30 kg. per sqm on the prepared granular surfaces treated cleaned with hydraulic broom as per technical specification clause 503. including all t&p, labour, cost of bitumen etc. complete but excluding gst providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm and 11.2 mm (proportion 2:1) aggregates and using (vg-10) bitumen to required line, grade and level to s
Sector: PWD