Details: survey work & jungle cutting for survey of nala making approach road by e/w cutting or embankment in be soil. site cleaning & dag balling of site earthwork excavation in mar kabar, rankar and kankar mixed hard soil including lead 30 m and lift 1.5m 40% of e/w as above earthwork but 60% of e/w ift 1.5m to bed level is 60% of e/w earth work in excavation in mar, kabar rankar and kankar mixed saturated soil. with 5 lifts & 30 m lead removal of slush from bed of nala before excavation of saturated soil. c.c.in 1:3:6 cement, sand and 20 to 40 mm granit stone grit including the cost of materials labours and etc. required for proper completion of work. r.c.r stone massonery work in 1:4 cement sand 9 mortar including the cost of material, labour etc. required for proper completion of work. r.r stone massonery work in 1:4 cement sand mortar including the cost of material, labour etc. required for proper completion of work. c.c.in 1:2:4 cement, sand and 10 to 20 mm granit stone grit including th
Sector: Irrigation