Details: construction of gahari nali dismelting of brick work or stone work in lime or cement corse imcluding stacking or matrial as per encharge e/w excavation in soil mixed with b.c/ kankarsoil i/c etc all completeas per si no 253 p/l and consolidation of 22.4-53mm stone ballast patch repair holes filling repairing of edges and renewing udulation on exiting surface by road including patch with stone dust mat. also including road roller and water charges cement concrete with 1:4:8 cement , c sand and 40 mm guage stone ballast i/c s/o all matterial labour t&p etc complete as per si no 281 stone massonary work in cement mortar 1: 3 for substructure pointing with cement mortar (1:3) on stone work in substructure pcc work with 1:2:4 cement,csand and stone dall gritt i/c s/o all mat. lab. t&p etc earthwork in embankemnt in mooram and black coton soil. excavation to be in the form of regular pits and exceeding 0.5 in depth and earth work in embankment to be 20 cm layers inclu
Sector: RDPR