Details: dismentling of flexiable pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials.(dsr 2023, 15.59) earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. extra for cartage of malwa and other material as per the direction of e/i upto 5 km including loading and unloading but excluding stacking on pucca roads (dsr : 2023, 1.1.8) plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. brick masonry work in cement mortar 1:6 in foundation complete excluding pointing and plastering as per drawi
Sector: PWD