Details: cleaning of the site for workable etc. all complete. (non scheduled) dismentling existing damage plaster including disposal of refuse as directed by e/ic with in a distance of 60 meters etc. all complete. {chapter no. 17 s.i. no.16 (706)} dismantling of old interlocking tiles pavement including staking of serviceable material and disposal of unserviceable material within lead of 50m as per direction of engineer in charge. (ns) dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by e/ic with in a distance of 60meters (200 feets). (17-chapter si.no.5) earth work in excavation in foundation in ordinary soil (loam, clay or sand) including, lift up to 1.50 m and lead up to 30m and including filling watering and ramming of excavated the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 30 m form the foundation trenches
Sector: RDPR