Details: dismentling of cement concrete and its stacking as directed by the engineer- in-charge. as per sino. 697 disposal of malba from the site upto 5 km cartage. earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 m. in depth and earth work in embankment to be 20 cm. layers including remming and dressing the surface to required levels and slopes and also including 1.50m. lift and 30 m. lead. the earth from cutting to be used in making embankment or to be deposited as spoil banks with in 30 m. distance directed by the engineer-in-charge. (royality removed by govt.) for small works / abadi area. (where machine can not move). s.i.no. (253+261b+231a). concrete with 4 cm gauge stone ballast , coarse sand and cement in proprtion of 8:4:1 in foundation and under floors, including supply of all materia
Sector: RDPR