Details: earth work in cutting or in embankment with ordinary soils including lead up to 30m and lift up to 1.5m including dressing and manual compaction etc.complete. earth work in foundation in dry ordinary soil (loam clay or sand) including lift up to 1.5 meter and lead up to 30 meter and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal or surplus earth as directed by the engineer-in-charge up to a distance of 30m from the foundation trenches centering and shuttering of c.c. work including rent of shuttering material, labour and t&p required for proper completion of work providing and laying cement concrete (1:4:8) in base with cement , coarse sand , and 20mm to 40mm stone ballast including cost of all material, labour and t&p etc.complete. laying c.c. 1:3:6 mix cement, coarse sand & 20 well graded mm down graded stone grit including co
Sector: Irrigation