Details: 00.00 to 1.50 mwter earth work 1.50 mteter to 3.50 meter in satureted soil 0.00 to 1.50 meter s/f of sign board removal of slush c.c. in 1:3:6 c/s 25-5040 mm s/b r.c.r. stone masonary with (khanda stone) with cement mortar in 1:4 r.r. stone masonary with hard stone bolder in cement mortar 1:4 c.c. in 1:2:4 c/s 10-20 mm stone grit cement pointing in 1:2 (struck rised ) on stone masonary cement plaster 1:2 on stone masonary dry stone pitching dewatering during work by 8.00 h.p. disel pump set
Sector: Irrigation