Details: teen shed site clearing cutting jungle earth work in excavtion lean concrete in foundation in 1:4:8 rcc work in foundation pedastle providing cutting bending ms bar reinforcement supply and fixing ms tublar structure pipe in shed proviiding and fixing profile sheet roofing over shed random rubble masonry with hard stone in foundation and plinth includinglevelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12graded stone aggregate 20 mm nominal size) upto plinth level with : supply and filling of loose earth under floor supply and filling of sand under floor 15 mm cement plaster in single coat on fair side of single or hal brick wall for interior plastering upto floor two level including internal rounded angles chamfers, and/or rounded angles not exceeding 80 mm. in girth and finished even and smooth. no extra for mixing any additive.in rough surface of wall lean concrete under floor kota stone slab flooring over 20 mm (average) thick base laid over andjointed with grey
Sector: Infrastructure