Details: dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead .(of area 3 sq. metres and below) dsr no.-15.12.1 demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge.(in cement mortar) dsr no.-15.7.4 demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in - charge.nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) dsr no.-15.2.1 demolishing r.c.c. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of engineer - in- charge.dsr no.-15.3 dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of to
Sector: Transmission