Details: earth work in excavation in trenches for foundation pipes cables etc. in ordinary soil (loam ,clay or sand)including lift up to 1.5m & lead up to 30 m and dressing of sides and rammings of bottom and disposel of surplus excavated earth as directed by engineer including within a lead of 30m cartage of earth or fly ash ist km. (if lead is beyond 1/2 km.) transportation of boring material & boring set including loading & unloding at site 200 mm dia boring drilling with casing pipe or small drilling machine 160 mm 6 kgf/cm2 pvc plain/perforted pipe kishan/ supereme quality or equivalent 160 mm pvc end cap solvent cement nylon mesh nylon dori 5 mm. development of boring 2-4 mm pea gravel (22/7/4)x(.20)2-(.11)2xdepth of boaring concrete with 4 cm. gauge stone ballast, coarse sand and cement, in proportion of 1:4:8 in foundations and under floors, including supply of all materials, labour, tools & plants etc. required for proper completion of the work m-150 brick work in 1:4 (one ce
Sector: Irrigation