Details: e/w in excasvation in ordinary soil i/c 1.50 m lift & 30 m lead(loam clay and sand) including lift upto 1.5 m and lead up to 30 mm and including filling watering and ramming of excavation earth into the trencher or into the space between the bulding and the sides of foundation trecnchers or into the plinth and removal and disposal of surplus earth as directed by the engineer in charge upto a distances of 30 m from the foundtion trenchs. and added additonal 1 lift and lead.for laying hume pipe e/w in excavation in ordinary soil i/c 1.50 m lift & 30 m lead(loam clay and sand) including lift upto 1.5 m and lead up to 30 mm and including filling watering and ramming of excavation earth into the trencher or into the space between the bulding and the sides of foundation trecnchers or into the plinth and removal and disposal of surplus earth as directed by the engineer in charge upto a distances of 30 m from the foundation trenchs. for interlocking foot path boxing,for planting ,for fencing
Sector: RDPR