Details: (a) work route survey & prepration of drawing including digging of trial pits for specified route length excavation of trench laying of all (3+1) single core cable through hdpe pipes in road/rail crossing along with installation of approach cable sand bedding and laying of all (3+1) single core cable along with approach cable in excavated trench (including jointing and installation of approach cable) backfilling of trench with sand, rcc cover and installation of warning tape, route marker & filling and levelling of excavated earth. the work site shall be left as clean as possible installation of outdoor end termination including all associated works installation of single phase link boxes with/without svl testing & commissioning per bay civil foundation and of structure for la including all associated works formation of trenchless road with hdpe 3+1-132kv lifting of cable to tower top and placing for termination cost of excavation of 132 kv tower foundation pits including all earth
Sector: Transmission