Details: dismantling reinforced cement concrete or reinforcement brickwork including stacking of materials as directed by the engineer in charge within a distance of 60 mtrs or (200 feet). si no. 694/2022 dismantling of flexible pavements and disposal of dismantled materials upto a lead of 1000 m (1km), stacking serviceable and unserviceable materials separately as per technical specification.bituminous course 15.59 dsr disposal of building / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. 15.60 dsr/2021 taking out existing cc interlocking paver blocks from footpath / central verge, including removal of etc. disposal of unserviceable material to the dumping ground for which payment shall be made separately and stacking of servicable material within 50 metre lead as per di
Sector: Urban Authority