Description: Plantation work by Miyawaki Method with Three Years Maintenance at Mavaiya G S Land Arazi No 1638 20000 Plants Name of Work Plantation work by Miyawaki Method with Three Years Maintenance at Mavaiya G S Land Arazi no 1638 20000 Plants
Details: Part-A Civil work Surface Dressing of Ground. E/w in excavation in trenches for foundations pipes cable etc. in ordinary soil (Loan clay or sand ) including lift upto 1.5 m lead upto 50m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer i/c with in a lead of 50 m. SOR 19, 251 Class m-150 brick work with 1:4 C/C. Sand in mortar in Foundation above and plinth 15 level including supply of all materials labour T&P complete. (SI No 305) Class m-150 brick work in S/S with 1:4 cement & c. sand. P/L C.C. in 1:4:8 ( one cement : 4 fine sand & 8 Brick ballast 40 mm nominal size etc. all Complete. S.I. no. (4.1.8) 12 mm cement plaster with 1:4 cement & coarse sand mortarincluded in all materials, labours T&P etc all complete. S.I. no. 17.58 providing and applying white cement based putty of average thickness of 1 mm of approved brand and manufacture over the plastered wall surface to prepare the surface even and smooth including cost
Sector: Urban Authority