Details: surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of , lead upto 50 m and lift up to 1.5 m. dar/18/2.28 based on upped sor 2020 supply of labour tractor trolley with driver providing and laying at or near ground level factory made kerb stone of m-25 grade cement in position to the required line, level and curvature jointed with cement mortar 1:3 (1 cement: 3 coarse sand) including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm) including making drainage opening wherever required complete etc. as per direction of engineer-in-charge (length of finished kerb edging shall be measured for payment). (precast c.c. kerb stone shall be approved by engineer-in-charge). fixing of kerb stone cement in position to the required line, level and curvature jointed with cement mortar 1:3 (1 cement: 3 coarse sand) including making joints with or without grooves (thickness of j
Sector: Industry Development