Details: excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the engineer incharge up to a distance of 30 meters from the foundation trenches. providing & laying granular sub-base by well graded material grade-i, spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotavator at omc,and compacted with smooth wheel roller to achieve the desired density,complete as per technical soecification clause 401 of mord [sr no 4.1] cement oncrete with 4cm gauge approved stone ballast coarse sand and cement in proportion of 1:4:8 including supply of all materials, labour and t&p etc. required for proper completion of work. earth work in ordinary soil on shoulders with ap
Sector: Sugar