Details: providing & laying spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at omc in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layer with paver in sub-base/base coarse on well prepared surface and compacting with vibratory roller to achieve the desired density, mort&h-406. providing and applying primer coat with 80/100 bitumen emulsion on prepared surface of granular base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm. usin mechanical means, including supply of all materials, labour, t&p etc required for proper completion of the work as per clause- 502 of mort & h specifications and as per direction of the engineer-in-charge. (a.r.) providing and applying tack coat with 80/100 bitumen emulsion using emulsion pressure distributor at the rate of 0.30 kg. per sqm. on the prepared bituminous/ granular surface cleaned with mechanical broom, includ
Sector: Urban Authority