Details: part a : drain work excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.50m and lead upto 30m. and including filling watering and ramming of excavated earth into the trenches or into space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge upto a distance of 30m from the foundation trenches. cement concrete with 4 cm gauge approved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all materials , labour, tools & plants etcc required for proper completion of the work.in bedding of rcc pipes,including cost of form work in the trenches rcc work in ratio 1:1.5:3 with cement and coarse sand and 200mm stone grit………completion of work. m.s (tor steel or plain) work in plain work such as rcc or rb work including bending for proper shape and including supply of steel and its wastage, bend, hooks and authorized over lapping sh
Sector: Urban Authority