Details: cost of earth filling, supply of manure, plantation, levelling, etc. supplying and stacking of good earth at site including royalty and carriage up to 5 km lead complete (in case of extra lead rate shall be revised based on dsr sor). earth measured in stacks will be reduced by 20% for payment. the filling is proposed at the level of adjacent road level, which will be settled down in due course of time by 20%. spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to be paid separately). mixing earth and sludge or manure in the required proportion specified or directed by the officer-in-charge uprooting rank vegetation and weeds by digging the area to a depth of 60 cm, removing all weeds and other growth with roots by forking repeatedly, breaking clods, rough dressing, flooding with water, uprooting fresh g
Sector: Infrastructure