Details: boq demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in - charge. nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) dsr-18/15.2.1 demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer - in - charge. nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix) dsr-18/15,2.2 demolishing dry brick petching in floors, drain etc. including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge. dsr-18/15.7.1 excavation in foundation in ordinary soil (loam, clay or sand) including lift upto 1.50 m. and lead upto 30 m. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of sur
Sector: Industry Development