Details: earth work in cuting or in embankment in ordinary soil excavation to be the form of regular pits not exceeding 0.5 meter (20") in depth and earth work in enbankment to be in 20cm (8") layers including ramming and dressing the surface to required levels and slopes and also including 1.5m (5") lift and 30m (100") lead the earth form cutting to be used in making embankments or to be deposited as spoil bankswith in 30 m distance as directed by the e/i. [pwd sor-2020 si no. 253] excavation fin foundation in ordinary soil (loam, clay or sand) including lift upto 1.5m and lead upto 30m and including filling watering and ramming of excavated earth into the space between the building and the sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the e /i upto a distance of 30 m from the foundation trenches includind all t&p, phowarah and basket etc . complete. (pwd sor 2020 s.i. no. 251 supply of gsb closed graded for grade-1 including sprea
Sector: Urban Authority