Details: construction of tubewell 2100 uohu jktdh; uydwi fuekz.k ifj;kstuk ¼lkeku;½district agra (construction of 03 no. tubewell) drilling of 450/600 mm dia. bore by using direct/reverse rotary rig machine up to 165mtr (165x03=495mtr) depth for construction of state tubewell 1.0 cusec at district agra works include drilling of tubewell, transportation & placement of rig machine & allied equipments at drilling site, digging of pits for storage of water lowering of recommended 300mmx150mm m.s pipe assembly by ensuring verticality of assembly in proper manner, welding of pipes with socket etc. screening and feeding of pea gravel after lowering of assembly and washing of bore for proper completion of work including cost of t&p and labour charges etc. (recommended m.s. pipe assembly 300mmx150mm and required pea-gravel shall be provide by the department. hsd oil will be provide by the department at site @ 7.00 ltr./mtr uksv&¼1½ th,lvh fu;ekuqlkj vyx ls ns; gksxka¼2½ lowering assembly plus 09 mtr.
Sector: Irrigation