Details: civil work: centring and shuttring including strutting ,propping etc and removal of from work for suspendefloor, roofs, landing, balconies and access plateform.(upto 5th floor)( pwd 5.9.3) dismantling reinforced cement concrete or reinforced brick work, including stacking of dismantled materials as directed by the engineer-incharge within a distance of 60 metres. (csi no. 15.03) dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by the engineer-in-charge within a distance of 60 metres (csi no. 15.01) disposal of / debris out side the uppcl area as per direction of er/in- charge including cartage, labour and materials, t&p etc. required for proper completion of the work. (no. deduction for voids shall be made). (csi no. 20.16) repair to plaster or pointing in patches including removal of old plaster racking out joints to 1 cm.(3/8") depth,watering the area an
Sector: Distribution