Details: dismantling brick work manually/ by mechanical means including stacking of serviceable material and disposal of unseviceable materials within 50 metres lead as per direction of engineer-in- charge. in cement mortar ch-17 item no-15.7.4 dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of to the dumping ground within 50 metres lead. ch-17 item no- 27 (15.56) dismantling tile work in floors and roofs laid in cement mortar including stacking material with in 50 metres lead. for thickness of tiles 10 mm to 25 mm ch-17 item 15.23.1 demolishing r.b. work manually by mechanical means including stacking of steel bars and disposal of unseviceable material within 50 matres lead as per direction of engineer- in- charge.ch-17 item no- 27 item no- 15.4 earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lif
Sector: Buildings