Details: appraoch road:- jungle clearance including uprooting of trunk vegetations grass bush and sapling of girth upto 30 cm. at a height of one meter above ground level and removal of up to a distance of 50 mtr. outside the periphri of area cleaned. construction of embankment with material obtained from borrowpits.construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacting to meet requirement of table 300-2. cement treated crushed rock or combination as per clause 403 and table 400.4 in sub base/ base. providing, laying and spreading material on a prepared sub grade, adding the designed quantity of cement to the spread material, mixing in place with rotavator, grading with the motor grader and compacting with the road roller at omc to achieve the desired unconfined compressive strength and to form a layer of sub-base.quantity of cement assumed as 2 per cent of quantity of crushe
Sector: Infrastructure