Details: cutting & clearance of jungle, bushes, shrubs ankra/ipomoea, juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the engineer-in-charge. cost of wood has been deducted from rates and thus will be property of contractor after cutting. thick demolishing stone rubble masonry including stacking of usable material and disposal of unuseable material within 50 meters lead inclusive of de-watering wherever required. in cement mortar random rubble stone masonry (using r. r. stones where 75% stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg) for foundation including curing with all leads of all construction materials including curing etc. complete. (b) in cement sand mortar 1:4 plaster in cement sand mortar 1:4 including racking of joints, smooth finishing & curing etc. complete including all leads of all construction materials of thickness: (a) 20 mm providing and laying cement concrete coping
Sector: Irrigation