Details: excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect. hard / dense soil. extra lead over item no 1 of excavated material. beyond initial lead of 50 m & upto 1.5 km dismantling cement concrete including disposal of material within 50 m lead, inclusive of de-watering wherever required. providing and laying in position of cement concrete nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. well graded crusher broken stone aggregate of maximum size upto 20 mm re-handling of excavated material including loading unloading and dressing within initial lead of 50 m and lift of 1.5m with cost of de-watering wherever required
Sector: Irrigation