Details: cutting & clearance of jungle, bushes, shrubs ankra/ipomoea, julicflora typna etc. on canal and bunds in dry/moist/ slushy conditions including disposal as per instructions of the engineer-in-charge. cost of wood has been deducted from rates and thus will be property of contractor after cutting. (b) thick excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect. hard/ dense soil (quantity as per e/w calculation sheet) extra charges for disposal of excavated/re-handled material in required profile in uniform layers and given side slopes well dressed having layer thickness including loading and un-loading wherever required with cost of dewatering wherever required complete in all respect. not exceeding 20cm providing laying & fixing in position rcc spun or hume pipe (is 458-2003) with collars in required size p
Sector: Irrigation