Details: removal of slit/soil/earth, sand, pebbles, 'malba', debris, , stone pebbles & obstruction deposited in canal bed up to design line grade and sections having design due to erosion/scour/slips in canal banks/silting with or without bushes and weeds etc. in dry or moist condition from canal bed including dewatering, loading unloading and disposal at suitable place as directed by engineer in charge with initial lead of 50m and lift upto 1.5 m with proper dressing on canal bed complete in all respect. for depth above 15 cms but upto 30cms having add extra over item no. 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and un-loading wherever required.
Sector: Irrigation