Details: supplying and stacking good earth at site of work. note: 1) loading, unloading and carriage to be paid extra as per actual 2) earth measured in stacks will be reduced by 20% foe payment supply at site of work well decayed farm yard manure, from any available source, approved by the engineer in-charge including screening and stacking. spreading of sludge farm yard manure or/ and good earth in required thickness (cost of sludge, farm- yard manure or/and good earth to be paid for separately) digging holes in all kinds of soil and refilling the same with the excavated earth mixed with well decayed farm yard manure (cost of well decayed farm yard manure to be paid separately).hole 0.9 m dia and 0.9 m deep supply and planting following in poly bags / earthen pots well branched, well established & free from disease of 600 mm min. height shurbs at site in 0.45 m dia holes, 0.45 m deep dug in the ground, mixing the soil with decayed farm yard/sludge manure, backfilling the hole watering etc as
Sector: Urban Authority