Details: repair work of whs at rajhans dhindol bassi earth work in excavation by mechanical means (hydraulic excavator )/ manual means over areas (excecding 30cm in depth. 1.sm in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m.disposed carth to be levelled and neatly dressed: ail kind od soil filling available excavated earth (excluding rock) in |trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth, consolidating cach deposited layer by ramming and watering including lead up to 50 meter and with all lift. demolishing stone rubble masonry manually/ bymechanical means including stacking of erviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge:in cement mortar. plaster on new surface on walls in cement sand mortar 1:6 |including racking of joint etc. complete fine finish : 20mm thick. brick masonry with f.p.s. bricks of class esignation 75 in |fo
Sector: Water supply and Sewerage