Details: taking out doors, windows and clearstory windows shutters (steel or wood) including stacking within 50 meters lead: of area 3 square meter and below. dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of to the dumping ground within 50 meter lead. providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - all work up to plinth level. m10 grade nominal mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). brick work with f.p.s. bricks of class designation 75 in superstructure above plinth level upto floor v level in all shapes and sizes in : cement mortar 1 : 6 (1 cement : 6 coarse sand) half brick masonry in superstructure , above plinth level upto floor v level using bricks of designation 75, cement mortar 1 : 4 (1 cement : 4 coarse sand) providing and fixing marble stone flooring table r
Sector: Tourism