Details: wall costruction excavating 1.5 depth of ballast in the well, ditch, gargoyle, pounding the bottom, pouring water, grooming the sides, taking out the excavated soil, filling the empty places with soil again after filling the foundation and filling the remaining soil at a distance of 50 meters. dispose of till43.26p.cum130.85658.41neech and cushion first class brick masonry in cement-gravel 1:6 or 1:8 mortar, including closing of side cracks and valley.113.51p.cum4358.72494758.3117cement masala 1:63first class in superstructure masonry, masonry of bricks, cement, gravel, 16 mortar, closing of side cracks and terai.92.51p.cum4590.15424634.78including. atirika rashi brick square rectangular pillars4maximum length of superstructure in construction up to 12 meters.14.64p. cum425.006223.665cement planter on wall by mixing cement-gravel in 1.5 ratio including scraping of joints and leveling. 20m469.72p.sqmtr167.4378645.226cement plaster on wall by mixing cement gravel in 16
Sector: Zilla Parishad