Details: dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of to the dumping ground within 50 meter lead. demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge. in cement mortar dismantling tile work in floors and roofs laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 meter lead:for thickness of tiles 10mm to 25mm. demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of engineer-in-charge.1: 3: 6 or richer mix. carriage of building stone metal (grit and ballast etc.) including loading, unloading complete with a lead for 10 km taking out doors, windows and clearstory windows shutters (steel or wood) including stacking within 50 meters lead:of area 3 sq
Sector: Water supply and Sewerage