Description: Work of Operation and Maintenance of Bisalpur Ajmer Pushkar WSP Name of Work Operation and Maintenance of Bisalpur Ajmer Pushkar Water Supply Project on ESCO cum O M contract
Details: Assumed Saving (i.e. 20%) Guaranteed minimum energy saving to be Retained By the department. (PHED) (i.e. 10%) % (Percentage) Additional Saving to be paid to the Department(PHED) by contractor out of the total saving achieved above 10% minimum guaranteed saving for the O&M of pump houses and connecting pipelines as defined in the scope of work for ESCO contract. (Evaluation of Bid Shall be carried out as per Section lll : Evaluation and Qualification Criteria -A. Evaluation Criteria ).
Sector: Water supply and Sewerage