Details: barricading with sal ballies as per design including tying with vertical post by coconut strings including digging out holes in all types of soil complete in all respect with two horizontal members height 1.2 m upto 1.5m above ground level and vertical supports upto 2.5 centre and upto 3 days period including removal and cleaning the site complete in all respect & including dressing of sides and providing retro reflective tapes for traffic safety as per direction of engineer-in charge in all types of soil. add extra for hire charge for providing welded mesh size 25x25 mm (16swg) over barricating (excluding hire charge of barricating):for 7days add extra for item no. 5.18 & 5.19 in barricading for each subsequent day after 3 days making of holes in cement concrete/ bitumenous road by power driven hammer for barricating work as per direction of engineer in charge