Details: cutting & clearance of jungle, bushes, shrubs ankra/ipomoea, julicflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the engineer-in-charge. cost of wood has been deducted from rates and thus will be property of contractor after cutting.ordinary excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect soft/loose soil lift upto 1.5 m excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect soft/loose soil add extra over ietm 1 to 8 for disposal of excavated material above initial lift of 1.5m and for every additional lift of 1.5m or part there of including loading and unloading wherever required lift up
Sector: Water Resource Department