Details: carbon steel piping welding upto 24" nb pipes with shielded metal arc welding method (welding with electrode e-7018 spl.) including, alingment and fitup for welding joints including bevel edge preparation, root and final pass lpt as per technical specification and guideline of eic. socket welded/fillet weld type joints with pipe thickness up to 10 mm weld upto type joints with pipe thickness up to 10 mm of pipes along with its fittings, flanges, valves, srv's, rupture disc, carrying out jointing and torquing, insulation of anchor bolts, pipe hangers, etc. material required for temporary scaffolding and its preparation shall be in contractor scope. removal of existing pipe cutting by gas cutting/grinding operation from the position:-existing pipeline to be removed by grinding & cutting by gas/ electrode. removed pipe spool to be returned to hwpk stores. all consumables shall be in contractor scope. scaffolding material required for execution of work and its preparation shall b
Sector: Water Resource Department