Details: cutting & clearance of jungle, bushes, shrubs ankra/ipomoea, juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the engineer-in-charge. cost of wood has been deducted from rates and thus will be property of contractor after cutting.a ordinary excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect soft/loose soil hard / dense soil hard soil mixed with kankar / boulders, morrum refilling the excavated earth (excluding rock) in trenches, plinth side of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering including cost of water, loading and un-loading wherever required with cost of dewatering wherever required. supplying, laying & spreading of ldpe film of 250 micron on bed and sides including joint
Sector: Water Resource Department